Seguir
Jawad H Gull
Jawad H Gull
Dirección de correo verificada de fiu.edu
Título
Citado por
Citado por
Año
Large amplitude vibrations of long-span transmission lines with bundled conductors in gusty wind
PV Hung, H Yamaguchi, M Isozaki, JH Gull
Journal of Wind Engineering and Industrial Aerodynamics 126, 48-59, 2014
442014
Improved inspection techniques for steel prestressing/post-tensioning strand
A Azizinamini, J Gull
FDOT Contract BDK80, 977-13, 2012
242012
Flexible pile head in jointless bridges: Design provisions for H-piles in cohesive soils
A Azizinamini, A Yakel, A Sherafati, R Taghinezhad, JH Gull
Journal of Bridge Engineering 21 (3), 04015064, 2016
202016
Assessment and evaluation of timber piles used in Nebraska for retrofit and rating.
A Mohammadi, JH Gull, R Taghinezhad, A Azizinamini
Nebraska. Dept. of Roads, 2014
192014
Compilation of accelerated bridge construction (ABC) bridges
D Garber, JH Gull, M Sheifiefar, N Rezaei
Accelerated Bridge Construction University Transportation Center (ABC-UTC), 2016
132016
Experimental evaluation of repair options for timber piles
JH Gull, A Mohammadi, R Taghinezhad, A Azizinamini
Transportation Research Record 2481 (1), 124-131, 2015
102015
Improved inspection techniques for steel prestressing/post-tensioning strand: Volume I
A Azizinamini, J Gull
Florida International University, 2012
102012
Comparison of detailing methods for straight skewed steel I-girder bridges
JH Gull, A Azizinamini, TA Helwig
Journal of Constructional Steel Research 136, 24-34, 2017
62017
Steel plate girder diaphragm and cross bracing loads.
JH Gull, A Azizinamini
Florida. Dept. of Transportation, 2014
42014
Interpretation of field measured vibrations in transmission lines by gust response analysis.
Gull, J.H., Yamaguchi, H., Kumagai, K., Hung, P.V.
In: Proceedings of 9th International Symposium on Cable Dynamics, Shanghai …, 2011
42011
Vibration Monitoring During the Deconstruction of a Post-tensioned Segmental Bridge: Case Study
R Taghinezhad, JH Gull, H Pham, LD Olson, A Azizinamini
Transportation Research Board 96th Annual MeetingTransportation Research Board, 2017
32017
Comprehending Performance of Cross-Frames in Skewed Straight Steel I-Girder Bridges
JH Gull
32014
Experimental Investigation of Longitudinal Closure Pour Detail for Prefabricated Slabs Used in Modular Construction
JH Gull, A Yakel, A Azizinamini
Transportation Research Board 93rd Annual MeetingTransportation Research Board, 2014
32014
Managing Florida's fracture critical bridges-phases 1 and 2
H Pham, JH Gull, A Mohammadi, A Azizinamini
Florida. Department of Transportation. Research Center, 2016
22016
Steel framing strategies for highly skewed bridges to reduce/eliminate distortion near skewed supports.
JH Gull, A Azizinamini
Florida International University, 2014
22014
Assessment and Evaluation of Timber Piles Used in Nebraska for Retrofit and Rating
A Azizinamini, A Mohammadi, JH Gull, R Taghinezhad
22014
FDOT protocol for condition assessment of steel strands in post-tensioned segmental concrete bridges: volume II
A Azizinamini, J Gull
Florida International University, 2012
22012
Non-Destructive Testing (NDT) of a Segmental Concrete Bridge Scheduled for Demolition, with a Focus on Condition Assessment and Corrosion Detection of Internal Tendons
A Sadeghnejad, SF Fancy, A Valikhani, B Chunn, A Mohammadi, ...
12017
Simplified Method to Determine the Effect of Detailing on Cross-Frame Forces
JH Gull, A Azizinamini
AISC Engineering Journal 56 (4), 187-200, 2019
2019
and Industrial Aerodynamics
GV Iungo
J. Wind Eng. Ind. Aerodyn 149, 35-39, 2016
2016
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20