Minimizing rental cost under specified rental policy in two stage flow shop, the processing time associated with probabilities including break-down interval and job block criteria
S Sharma, D Gupta
European Journal of Business and Management 3 (2), 85-103, 2011
542011
Specially structured two stage flow shop scheduling to minimize the rental cost
G Deepak, S Sameer, S Bala
International Journal of Emerging trends in Engineering and Development 1 (2 …, 2012
232012
Threshold effect on a fuzzy queue model with batch arrival
M Mittal, TP Singh, D Gupta
Arya Bhatta Journal of Mathematics and Informatics 7 (1), 109-118, 2015
172015
Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment
D Gupta, S Sharma, S Aggarwal
Opsearch 50 (1), 14-24, 2013
172013
Optimal scheduling for total waiting time of jobs in specially structured two stage flow shop problem processing times associated with probabilities
D Gupta, B Goyal
Arya Bhatta Journal of Mathematics and Informatics 8 (1), 45-52, 2016
152016
3-stage specially structured flow shop scheduling to minimize the rental cost including transportation time, job weightage and job block criteria
D Gupta, S Bala, P Singla, S Sharma
European Journal of Business and Management 7 (4), 1-6, 2015
142015
Optimal Two Stage open Shop specially structured scheduling To Minimize the Rental Cost, processing time associated with probabilities including transportation time
D Gupta, S Bala, P Singla
IOSR Journal of Mathematics 3 (3), 01-06, 2012
132012
Heuristic approach for n-jobs, 3-machines flow shop scheduling problem, processing time associated with probabilities involving transportation time, break-down interval …
D Gupta, S Sharma, S Sharma
Mathematical Theory and Modeling 1 (1), 30-36, 2011
132011
Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness
KK Nailwal, D Gupta, S Sharma
Cogent Mathematics 2 (1), 1019792, 2015
122015
On job block open shop scheduling, the processing time associated with probability
G Deepak, TP Singh
J. Indian Soc. Stat. Opers. Res 26 (1-4), 91-96, 2005
122005
Seema and Shefali (2011),“Bicriteria in n× 2 flow shop scheduling under specified rental policy, processing time and setup time each associated with probabilities including …
D Gupta, S Sharma
Industrial Engineering Letters 1 (1), 1-12, 2011
112011
Bicriteria scheduling on parallel machines: total tardiness and weighted flowtime in fuzzy environment
S Sharma, D Gupta, S Sharma
International Journal of Mathematics in Operational Research 5 (4), 492-507, 2013
102013
A Heuristic Approach to Flow Shop Scheduling Problem in Which Processing Times Are Associated with Their Respective Probabilities with No-Idle Constraint
D Gupta, H Singh
International Scholarly Research Notices 2013, 2013
102013
A Fuzzy logic based approach to minimize the rental cost of machines for specially structured three stages flow-shop scheduling
D Gupta, S Aggarwal, S Sharma
Advances in Applied Science Research 3 (2), 1071-1076, 2012
102012
On steady state behaviour of a network queuing model with biserial and parallel channels linked with a common server
D Gupta, S Sharma, N Gulati
Computer engineering and intelligent systems 2 (3), 11-22, 2011
102011
On network queue model centrally linked with a common feedback channel
TP Singh, G Deepak
Journal of Mathematics and System Sciences 6 (2), 18-31, 2010
102010
Job block concept in two stage specially structured Flow shop scheduling to minimize the total waiting time of jobs
D Gupta, B Goyal
International Journal of Latest Trends in Engineering and Technology 7 (3 …, 2016
92016
Analysis of biserial servers linked to a common server in fuzzy environment
D Gupta, S Sharma
International Journal of Computer Applications 68 (6), 2013
92013
Bi-objective scheduling on parallel machines with uncertain processing time
D Gupta, S Sharma, S Aggarwal
Advances in Applied Science Research 3 (2), 1020-1026, 2012
92012
Application of Branch and Bound Technique for n* 3 Flow Shop Scheduling in Which Processing Time Associated With Their Respective Probabilities
D Gupta
Mathematical Modeling and Theory 2 (1), 31-36, 2011