Seguir
Christina Burt
Christina Burt
Computing and Information Systems, The University of Melbourne
Dirección de correo verificada de ms.unimelb.edu.au - Página principal
Título
Citado por
Citado por
Año
Corrigendum: Match factor for heterogeneous truck and loader fleets
C Burt, L Caccetta
International Journal of Mining, Reclamation and Environment 22 (1), 84-85, 2008
175*2008
Equipment selection for surface mining: a review
CN Burt, L Caccetta
Interfaces 44 (2), 143-162, 2014
1352014
Equipment selection for mining: with case studies
CN Burt, L Caccetta
Springer International Publishing, 2018
642018
Models for Mining Equipment Selection
C Burt, L Caccetta, S Hill, P Welgama
MODSIM 2005 International Congress on Modelling and Simulation, 170-176, 2005
62*2005
An optimisation approach to materials handling in surface mines
CN Burt
Curtin University of Technology., 2008
582008
Equipment selection with heterogeneous fleets for multiple-period schedules
C Burt, L Caccetta, P Welgama, L Fouché
Journal of the Operational Research Society 62 (8), 1498-1509, 2011
292011
Planning for mining operations with time and resource constraints
N Lipovetzky, C Burt, A Pearce, P Stuckey
Proceedings of the International Conference on Automated Planning and …, 2014
252014
A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
ML Blom, CN Burt, AR Pearce, PJ Stuckey
INFORMS Journal on Computing 26 (4), 658-676, 2014
242014
An MILP approach to Multi-location, Multi-Period Equipment Selection for Surface Mining with Case Studies
C Burt, L Caccetta, L Fouché, P Welgama
Journal of Industrial and Management Optimization, 2013
182013
Scheduling with fixed maintenance, shared resources and nonlinear feedrate constraints: A mine planning case study
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming: 12th …, 2015
102015
Equipment Selection for Surface Mining: A Review
L Cacceta, C Burt
Journal Interface 44 (2), 143-162, 2013
92013
Caccetta, l.(2008).“Match factor for heterogeneous truck and loader fleets
C Burt
International journal of mining, reclamation and Enviroment, 0
5
Approximate Uni-directional Benders Decomposition
CN Burt, N Lipovetzky, AR Pearce, PJ Stuckey
Planning, Search and Optimization Workshop: AAAI 2015, 2014
42014
Delivering on delivery: Optimisation and the future of vehicle routing
C Burt, P Hart, D Petrova, A West
Operations Research Proceedings 2017: Selected Papers of the Annual …, 2018
32018
Scheduling Tools for Open-Pit Mining Operations
M Blom, C Burt, N Lipovetzky, A Pearce, P Stuckey
ICAPS-15 Sysdemo, 2015
32015
Exact Models for the k-Connected Minimum Energy Problem
C Burt, Y Chan, N Sonenberg
Ad Hoc Networks: First International Conference, ADHOCNETS 2009, Niagara …, 2010
32010
Generating explanations for mathematical optimisation: Solution framework and case study
C Burt, K Klimova, B Primas
ICAPS 2018 Workshop on Explainable Planning (XAIP), 2018
22018
Erratum to: Equipment Selection for Mining: With Case Studies
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, E1-E1, 2018
22018
Methodology: Preliminaries and background
CN Burt, L Caccetta
Equipment Selection for Mining: With Case Studies, 11-23, 2018
22018
Accurate costing in mixed integer utilisation mining models
C Burt, Y Chan
18th World IMACS Congress and MODSIM09 International Congress On Modelling …, 2009
22009
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20