Follow
semra tunalı
semra tunalı
İşletme Bölümü Profesörü, İzmir Ekonomi Üniversitesi
Verified email at ieu.edu.tr
Title
Cited by
Cited by
Year
A review of the current applications of genetic algorithms in assembly line balancing
SO Tasan, S Tunali
Journal of intelligent manufacturing 19, 49-69, 2008
2092008
The state of the art on buffer allocation problem: a comprehensive survey
L Demir, S Tunali, DT Eliiyi
Journal of Intelligent Manufacturing 25, 371-392, 2014
2052014
Joint optimization of spare parts inventory and maintenance policies using genetic algorithms
MA Ilgin, S Tunali
The International Journal of Advanced Manufacturing Technology 34, 594-604, 2007
1622007
A review of applications of genetic algorithms in lot sizing
H Guner Goren, S Tunali, R Jans
Journal of Intelligent Manufacturing 21, 575-590, 2010
1482010
An adaptive tabu search approach for buffer allocation problem in unreliable non-homogenous production lines
L Demir, S Tunalı, DT Eliiyi
Computers & Operations Research 39 (7), 1477-1486, 2012
732012
A tabu search approach for buffer allocation in production lines with unreliable machines
L Demir, S Tunali, A Lĝkketangen
Engineering Optimization 43 (2), 213-231, 2011
692011
Small response surface designs for metamodel estimation
I Batmaz, S Tunali
European Journal of Operational Research 145 (2), 455-470, 2003
582003
An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem
OS Akgündüz, S Tunalı
International Journal of Production Research 48 (17), 5157-5179, 2010
572010
Evaluation of alternate routing policies in scheduling a job-shop type FMS
S Tunali
Computers & industrial engineering 32 (2), 243-250, 1997
531997
A hybrid approach for the capacitated lot sizing problem with setup carryover
HG Goren, S Tunali, R Jans
International Journal of Production Research 50 (6), 1582-1597, 2012
472012
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
Journal of Manufacturing Systems 36, 147-158, 2015
452015
A review of the current applications of genetic algorithms in mixed-model assembly line sequencing
OS Akgündüz, S Tunalı
International Journal of Production Research 49 (15), 4483-4503, 2011
452011
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18, 434-469, 2013
422013
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013
372013
Dealing with the least squares regression assumptions in simulation metamodeling
S Tunali, I Batmaz
Computers & industrial engineering 38 (2), 307-320, 2000
342000
Evaluation of alternative line configurations in apparel industry using simulation
C Ünal, S Tunali, M Güner
Textile Research Journal 79 (10), 908-916, 2009
332009
Two approaches for solving the buffer allocation problem in unreliable production lines
L Demir, S Tunalı, DT Eliiyi, A Lĝkketangen
Computers & Operations Research 40 (10), 2556-2563, 2013
302013
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
282010
Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industry
SY Köse, L Demir, S Tunalı, DT Eliiyi
Engineering Optimization 47 (2), 149-164, 2015
262015
Setting order promising times in a supply chain network using hybrid simulation-analytical approach: An industrial case study
S Tunali, PM Ozfirat, G Ay
Simulation Modelling Practice and Theory 19 (9), 1967-1982, 2011
232011
The system can't perform the operation now. Try again later.
Articles 1–20