Seguir
Dimitris Paraskevopoulos
Dimitris Paraskevopoulos
Bayes Business School (formerly Cass), City, University of London
Dirección de correo verificada de city.ac.uk - Página principal
Título
Citado por
Citado por
Año
A reactive variable neighborhood tabu search for the heterogeneous fleet vehicle routing problem with time windows
DC Paraskevopoulos, PP Repoussis, CD Tarantilis, G Ioannou, ...
Journal of Heuristics 14 (5), 425-455, 2008
1772008
Resource constrained routing and scheduling: Review and research prospects
DC Paraskevopoulos, G Laporte, PP Repoussis, CD Tarantilis
European Journal of Operational Research 263 (3), 737-754, 2017
1222017
A web-based decision support system for waste lube oils collection and recycling
PP Repoussis, DC Paraskevopoulos, G Zobolas, CD Tarantilis, ...
European Journal of Operational Research 195 (3), 676-700, 2009
1022009
Optimizing emergency preparedness and resource utilization in mass-casualty incidents
PP Repoussis, DC Paraskevopoulos, A Vazacopoulos, N Hupert
European Journal of Operational Research 255 (2), 531-544, 2016
842016
Solving project scheduling problems with resource constraints via an event list-based evolutionary algorithm
DC Paraskevopoulos, CD Tarantilis, G Ioannou
Expert Systems with Applications 39 (4), 3983-3994, 2012
672012
A phase I study of pegylated arginine deiminase (pegargiminase), cisplatin, and pemetrexed in argininosuccinate synthetase 1-deficient recurrent high-grade glioma
PE Hall, R Lewis, N Syed, R Shaffer, J Evanson, S Ellis, M Williams, ...
Clinical Cancer Research 25 (9), 2708-2716, 2019
622019
A cycle-based evolutionary algorithm for the fixed-charge capacitated multi-commodity network design problem
DC Paraskevopoulos, T Bektaş, TG Crainic, CN Potts
European Journal of Operational Research 253 (2), 265-279, 2016
592016
A reactive greedy randomized variable neighborhood tabu search for the vehicle routing problem with time windows
PP Repoussis, DC Paraskevopoulos, CD Tarantilis, G Ioannou
Hybrid Metaheuristics: Third International Workshop, HM 2006 Gran Canaria …, 2006
372006
The congested multicommodity network design problem
DC Paraskevopoulos, S Gürel, T Bektaş
Transportation Research Part E: Logistics and Transportation Review 85, 166-187, 2016
282016
CSF rhinorrhoea after endonasal intervention to the skull base (CRANIAL)-part 1: Multicenter pilot study
DZ Khan, HJ Marcus, HL Horsfall, S Bandyopadhyay, BE Schroeder, ...
World neurosurgery 149, e1077-e1089, 2021
222021
Flexible job shop scheduling problems with arbitrary precedence graphs
GA Kasapidis, DC Paraskevopoulos, PP Repoussis, CD Tarantilis
Production and Operations Management 30 (11), 4044-4068, 2021
212021
CSF rhinorrhoea after endonasal intervention to the anterior skull base (CRANIAL): proposal for a prospective multicentre observational cohort study
DZ Khan, S Bandyopadhyay, V Patel, BE Schroeder, I Cabrilo, D Choi, ...
British journal of neurosurgery 35 (4), 408-417, 2021
132021
An adaptive memory programming framework for the resource-constrained project scheduling problem
DC Paraskevopoulos, CD Tarantilis, G Ioannou
International Journal of Production Research 54 (16), 4938-4956, 2016
132016
CSF Rhinorrhea after endonasal intervention to the skull base (CRANIAL)—part 2: impact of COVID-19
S Bandyopadhyay, DZ Khan, HJ Marcus, BE Schroeder, V Patel, ...
World Neurosurgery 149, e1090-e1097, 2021
122021
Incidental brain tumors in children: an international neurosurgical, oncological survey
J Roth, J Soleman, D Paraskevopoulos, RF Keating, S Constantini
Child's Nervous System 34, 1325-1333, 2018
122018
On the multiresource flexible job‐shop scheduling problem with arbitrary precedence graphs
GA Kasapidis, S Dauzère‐Pérès, DC Paraskevopoulos, PP Repoussis, ...
Production and Operations Management 32 (7), 2322-2330, 2023
112023
Addressing nodal constraints on the capacity of railways
J Armstrong, J Preston, C Potts, T Bektas, D Paraskevopoulos
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2017
52017
A unified solution framework for flexible job shop scheduling problems with multiple resource constraints
GA Kasapidis, DC Paraskevopoulos, I Mourtos, PP Repoussis
European Journal of Operational Research 320 (3), 479-495, 2025
12025
Addressing nodal constraints on railway capacity
J Armstrong, J Preston, C Potts, T Bektas, D Paraskevopoulos
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2017
2017
PRODUCTION AND OPERATIONS MANAGEMENT
K Park, S Lee, S Doosti, Y Tan, W Zhang, L Gao, M Zolghadr, D Jian, ...
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20