Follow
Hyun-Jung Kim
Title
Cited by
Cited by
Year
Digital twin-based cyber physical production system architectural framework for personalized production
KT Park, J Lee, HJ Kim, SD Noh
The International Journal of Advanced Manufacturing Technology 106, 1787-1810, 2020
1622020
Implementation of cyber-physical production systems for quality prediction and operation control in metal casting
JH Lee, SD Noh, HJ Kim, YS Kang
Sensors 18 (5), 1428, 2018
1492018
Scheduling cluster tools with ready time constraints for consecutive small lots
HJ Kim, JH Lee, C Jung, TE Lee
IEEE Transactions on Automation Science and Engineering 10 (1), 145-159, 2012
1072012
Noncyclic scheduling of cluster tools with a branch and bound algorithm
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (2), 690-700, 2013
1032013
Scheduling cluster tools for concurrent processing of two wafer types
JH Lee, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 11 (2), 525-536, 2014
692014
A branch and bound algorithm for cyclic scheduling of timed Petri nets
C Jung, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (1), 309-323, 2013
662013
Scheduling lot switching operations for cluster tools
JH Lee, HJ Kim, TE Lee
IEEE Transactions on Semiconductor Manufacturing 26 (4), 592-601, 2013
622013
Reinforcement learning for robotic flow shop scheduling with processing time variations
JH Lee, HJ Kim
International journal of production research 60 (7), 2346-2368, 2022
472022
Scheduling single-armed cluster tools with chamber cleaning operations
TS Yu, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 15 (2), 705-716, 2017
422017
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing
JH Lee, HJ Kim, TE Lee
International Journal of Production Research 53 (19), 6007-6022, 2015
412015
Optimal scheduling of transient cycles for single-armed cluster tools with parallel chambers
DK Kim, TE Lee, HJ Kim
IEEE Transactions on Automation Science and Engineering 13 (2), 1165-1175, 2015
412015
Time-feasible reachability tree for noncyclic scheduling of timed Petri nets
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (3), 1007-1016, 2014
392014
Item assignment problem in a robotic mobile fulfillment system
HJ Kim, C Pais, ZJM Shen
IEEE Transactions on Automation Science and Engineering 17 (4), 1854-1867, 2020
372020
Makespan analysis of lot switching period in cluster tools
JH Lee, HJ Kim
IEEE Transactions on Semiconductor Manufacturing 29 (2), 127-136, 2016
342016
Scheduling dual-armed cluster tools with cleaning processes
H Kim, HJ Kim, JH Lee, TE Lee
International Journal of Production Research 51 (12), 3671-3687, 2013
342013
Schedulability analysis for noncyclic operation of time-constrained cluster tools with time variation
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 13 (3), 1409-1414, 2016
322016
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
J Kim, HJ Kim
International Journal of Production Research 59 (18), 5438-5453, 2021
302021
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers
HJ Kim, JH Lee
Computers & Operations Research 126, 105115, 2021
282021
Non-cyclic scheduling of a wet station
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 11 (4), 1262-1274, 2013
282013
Closed-form expressions on lot completion time for dual-armed cluster tools with parallel processing modules
HJ Kim, JH Lee
IEEE Transactions on Automation Science and Engineering 16 (2), 898-907, 2018
272018
The system can't perform the operation now. Try again later.
Articles 1–20