Seguir
Afshin Mehrsai
Afshin Mehrsai
Dr.-Ing.
Dirección de correo verificada de nyenrode.nl
Título
Citado por
Citado por
Año
Integration of supply networks for customization with modularity in cloud and make-to-upgrade strategy
A Mehrsai, HR Karimi, KD Thoben
Systems Science & Control Engineering: An Open Access Journal 1 (1), 28-42, 2013
502013
Bridging lean to agile production logistics using autonomous carriers in pull flow
A Mehrsai, KD Thoben, B Scholz-Reiter
International Journal of Production Research 52 (16), 4711-4730, 2014
422014
Critical success factors for Lean implementation in IT outsourcing relationships: A multiple case study
V Blijleven, Y Gong, A Mehrsai, K Koelemeijer
Information technology & people 32 (3), 715-730, 2019
352019
Application of learning pallets for real-time scheduling by the use of radial basis function network
A Mehrsai, HR Karimi, KD Thoben, B Scholz-Reiter
Neurocomputing 101, 82-93, 2013
312013
Modelling and analysis of autonomously controlled production networks
B Scholz-Reiter, M Görges, T Jagalski, A Mehrsai
IFAC Proceedings Volumes 42 (4), 846-851, 2009
272009
Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network
A Mehrsai, HR Karimi, KD Thoben, B Scholz-Reiter
Mathematical Problems in Engineering 2013, 2013
262013
Make-to-XGrade for the Design and Manufacturing of Flexible, Adaptive, and Reactive Products
A Mehrsai, B Henriksen, CC Røstad, KA Hribernik, KD Thoben
Procedia CIRP 21, 199–205, 2014
212014
Toward learning autonomous pallets by using fuzzy rules, applied in a Conwip system
A Mehrsai, HR Karimi, B Scholz-Reiter
The International Journal of Advanced Manufacturing Technology 64, 1131-1150, 2013
152013
A computational method in analyzing of delivery time uncertainty for highly complex supply networks
M Safaei, A Mehrsai, KD Thoben
Measurement 55, 549-563, 2014
122014
Handling the dynamics in logistics-adoption of dynamic behavior and reduction of dynamic effects
B Scholz-Reiter, A Mehrsai, M Görges
Asian International Journal of Science and Technology in Production and …, 2009
122009
Decentralized vs. centralized sequencing in a complex job-shop scheduling
A Mehrsai, G Figueira, N Santos, P Amorim, B Almada-Lobo
Advances in Production Management Systems. The Path to Intelligent …, 2017
112017
Towards improving earthworks production from an Industry 4.0 perspective: the role of remote information technologies and dynamic optimization techniques
M Parente, A Gomes Correia, G Figueira, A Mehrsai
Proceedings of 7th Transport Research Arena (TRA 2018), Vienna, Austria, 2018
82018
Superior performance of leagile supply networks by application of autonomous control
B Scholz-Reiter, A Mehrsai
Advances in Production Management Systems. New Challenges, New Approaches …, 2010
82010
A meta-modeling technique for analyzing, designing and adapting healthcare processes: A process-deliverable perspective
V Blijleven, M Jaspers, M Wetzels, K Koelemeijer, A Mehrsai
2016 IEEE-EMBS International Conference on Biomedical and Health Informatics …, 2016
42016
Towards learning pallets applied in pull control job-open shop problem
A Mehrsai, B Scholz-Reiter
2011 IEEE International Symposium on Assembly and Manufacturing (ISAM), 1-6, 2011
42011
Analysis of learning pallets in flexible scheduling by closed queue network
A Mehrsai, B Scholz-Reiter, BL Wenning
2011 IEEE International Symposium on Assembly and Manufacturing (ISAM), 1-8, 2011
42011
Using Cloud, Modularity, and Make-to-Upgrade Strategy for Integrating Customized-Oriented Supply Networks
A Mehrsai, HR Karimi, KD Thoben
Advances in Production Management Systems. Sustainable Production and …, 2013
32013
Application of learning pallets for real-time scheduling by use of artificial neural network
A Mehrsai, HR Karimi, I Rügge, B Scholz-Reiter
2011 5th International Conference on Software, Knowledge Information …, 2011
32011
Decoding relationships of success factors for lean information technology outsourcing
V Blijleven, A Mehrsai
Advances in Production Management Systems: Innovative Production Management …, 2015
22015
A fuzzy programming method for optimization of autonomous logistics objects
A Mehrsai, KD Thoben, HR Karimi
2013 IEEE International Conference on Mechatronics (ICM), 344-349, 2013
22013
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20