Carlos Herrera
TitleCited byYear
Wind farm layout optimization using a Gaussian-based wake model
L Parada, C Herrera, P Flores, V Parada
Renewable Energy, 2017
332017
Viable system model approach for holonic product driven manufacturing systems
C Herrera, SB Berraf, A Thomas
Service Orientation in Holonic and Multi-Agent Manufacturing Control, 169-181, 2012
152012
A reactive decision-making approach to reduce instability in a master production schedule
C Herrera, S Belmokhtar-Berraf, A Thomas, P Victor
International Journal of Production Research, 2015
142015
A viable system model for product-driven systems
C Herrera, A Thomas, S Belmokhtar, R Pannequin
122011
Architecture de systèmes contrôlés par la produit pour un environnement de juste à temps
A Thomas, H El Haouzi, T Klein, S Belmokhtar, C Herrera
122009
Cadre générique de planification logistique dans un contexte de décisions centralisées et distribuées
C Herrera
102011
Assessing the energy benefit of using a wind turbine micro-siting model
L Parada, C Herrera, P Flores, V Parada
Renewable Energy 118, 591-601, 2018
92018
Simulation of less master production schedule nervousness model
C Herrera, A Thomas
IFAC Proceedings Volumes 42 (4), 1585-1590, 2009
82009
A product-driven system approach for multilevel decisions in manufacturing planning and control
C Herrera, A Thomas, V Parada
Production & Manufacturing Research: An Open Access Journal 2 (1), 756–766, 2014
72014
Proposition d'un cadrage générique de modélisation et de simulation de planifications logistiques dans un contexte de décisions partiellement distribuées
C Herrera
PhD thesis, Nancy Université, 2011
62011
Evolution of new algorithms for the binary knapsack problem
L Parada, C Herrera, S Mauricio, V Parada
Natural Computing, 2015
52015
A general approach for hierarchical production planning considering stability
S Belmokhtar, C Herrera, A Thomas
52010
Automatic generation of algorithms for the binary knapsack problem
L Parada, M Sepúlveda, C Herrera, V Parada
2013 IEEE Congress on Evolutionary Computation, 3148-3152, 2013
32013
Proposición de un método basado en cadenas de Markov para el pronóstico de fibrilaciones auriculares paroxísticas
P Sáez, C Herrera
Ingeniare. Revista chilena de ingeniería 23 (3), 449-457, 2015
22015
A holonic manufacturing system for a copper smelting process
C Herrera, J Rosales, A Thomas, V Parada
Service Orientation in Holonic and Multi-Agent Manufacturing, 189-197, 2016
12016
Polyhedron Flatness as an explanatory variable for Branch and Bound algorithm computational e ort
I Derpich, C Herrera
12013
Un modèle pour limiter la nervosité et l'instabilité du Programme Directeur de Production
C Herrera, A Thomas
12009
Formulation for less master production schedule instability under rolling horizon
C Herrera, A Thomas
12009
Complexity indices for the multidimensional knapsack problem
I Derpich, C Herrera, F Sepúlveda, H Ubilla
Central European Journal of Operations Research, 1-21, 2018
2018
The deep Peru 2015 doublet earthquakes
S Ruiz Tapia, H Tavera, P Poli, C Herrera, C Flores, E Rivera, ...
Elsevier, 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–20