Seguir
Nasser Shahsavari-Pour
Nasser Shahsavari-Pour
Dirección de correo verificada de vru.ac.ir - Página principal
Título
Citado por
Citado por
Año
A novel hybrid meta-heuristic algorithm for solving multi objective flexible job shop scheduling
N Shahsavari-Pour, B Ghasemishabankareh
Journal of Manufacturing Systems 32 (4), 771-780, 2013
982013
Time-cost-quality trade-off in project scheduling with linguistic variables
NS Pour, M Modarres, R Tavakkoli-Moghaddam
World applied sciences journal 18 (3), 404-413, 2012
462012
The discrete time-cost-quality trade-off problem using a novel hybrid genetic algorithm
NS Pour, M Modarres, M Aryanejad, RT Moghadam
Applied Mathematical Sciences 4 (42), 2081-2094, 2010
402010
A novel FMEA model based on fuzzy multiple-criteria decision-making methods for risk assessment
R Fattahi, R Tavakkoli-Moghaddam, M Khalilzadeh, N Shahsavari-Pour, ...
Journal of Enterprise Information Management 33 (5), 881-904, 2020
372020
Optimizing a multi-objectives time-cost-quality trade-off problem by a new hybrid genetic algorithm
N Shahsavari-Pour, M Modarres, R Tavakoli-Moghadam, E Najafi
World applied science journal 10 (3), 355-363, 2010
242010
A combined multi-objective intelligent optimization approach considering techno-economic and reliability factors for hybrid-renewable microgrid systems
A Heydari, MM Nezhad, F Keynia, A Fekih, N Shahsavari-Pour, DA Garcia, ...
Journal of Cleaner Production 383, 135249, 2023
232023
5. Optimizing a multi-objectives flow shop scheduling problem by a novel genetic algorithm
N Pour, R Tavakkoli-Moghaddam, H Asadi
International Journal of Industrial Engineering Computations 4 (3), 345-354, 2013
212013
Fuzzy Multiobjective Traffic Light Signal Optimization
N. Shahsavari Pour, H. Asadi
Journal of Applied Mathematics 2013 (Article ID 249726), 2013
142013
A hybrid intelligent algorithm for a fuzzy multi-objective job shop scheduling problem with reentrant workflows and parallel machines
MA Basiri, E Alinezhad, R Tavakkoli-Moghaddam, N Shahsavari-Poure
Journal of Intelligent & Fuzzy Systems 39 (5), 7769-7785, 2020
122020
A new approach for building a strategy map based on digraph theory
N Shahsavari-Pour, H Asadi, M Asadi-Pasoojani, M Kazemi, A Mirzaie, ...
International Journal of Applied Management Science 9 (1), 1-18, 2017
112017
A cause and effect two-stage BSC-DEA method for measuring the relative efficiency of organizations
NSP Seyed Esmaeel Najafi, Seyed Aliakbar Ahmadi, Fallah Mohammad
Management Science Letters 1, 41-48, 2011
112011
Designing an interpretative structural model for human resource agility
N Shahsavari-Pour, H Sayyadi-Tooranloo, E Pabarja, S Heydarbeigi
Middle East Journal of Management 8 (1), 92-109, 2021
102021
Fuzzy combinatorial optimization in four-dimensional tradeoff problem of cost-time-quality-risk in one dimension and in the second dimension of risk context in ambiguous mode
F Hosseinzadeh, B Paryzad, NS Pour, E Najafi
Engineering Computations 37 (6), 1967-1991, 2020
102020
Solving multi-mode time-cost-quality trade-off problem in uncertainty condition using a novel genetic algorithm
H Hosseini-Nasab, M Pourkheradmand, N Shahsavaripour
International journal of management and fuzzy systems 3 (3), 32-40, 2017
102017
A hybrid imperialist competitive algorithm for the flexible job shop problem
B Ghasemishabankareh, N Shahsavari-Pour, MA Basiri, X Li
Artificial Life and Computational Intelligence: Second Australasian …, 2016
92016
A new nondominated sorting genetic algorithm based to the regression line for fuzzy traffic signal optimization problem
H Asadi, R Tavakkoli Moghaddam, N Shahsavari Pour, E Najafi
Scientia Iranica 25 (3), 1712-1723, 2018
82018
An evolutionary hybrid method to predict pistachio price
A Heydari, F Keynia, N Shahsavari-Pour, R Sedaghat
Complex & Intelligent Systems 3, 121-132, 2017
72017
Calculating the project network critical path in uncertainty conditions
N Shahsavaripour, M Modarres, B Aryanejad, R Tavakoli Moghadam
International Journal of Engineering Technology 2 (2), 136-140, 2010
72010
A novel method for ranking fuzzy numbers based on the different areas fuzzy number
N Shahsavari-Pour, A Heydari, M Kazemi, M Karami
International Journal of Mathematics in Operational Research 11 (4), 544-566, 2017
62017
Time-cost-quality-risk trade-off in GIGA projects using specific techniques of hunting dolphins
B Paryzad, NS Pour
International Journal of Industrial and Systems Engineering 22 (4), 484-499, 2016
62016
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20