Yuli Zhang
Yuli Zhang
School of Management and Economics, Beijing Institute of Technology
Dirección de correo verificada de mail.tsinghua.edu.cn
Título
Citado por
Citado por
Año
Distributionally robust single machine scheduling with risk aversion
Z Chang, S Song, Y Zhang, JY Ding, R Zhang, R Chiong
European Journal of Operational Research 256 (1), 261-274, 2017
342017
Robust shortest path problem with distributional uncertainty
Y Zhang, S Song, ZJM Shen, C Wu
IEEE transactions on intelligent transportation systems 19 (4), 1080-1090, 2017
282017
Distributionally robust optimization of two‐stage lot‐sizing problems
Y Zhang, ZJM Shen, S Song
Production and Operations Management 25 (12), 2116-2131, 2016
252016
Lagrangian relaxation for the reliable shortest path problem with correlated link travel times
Y Zhang, ZJM Shen, S Song
Transportation Research Part B: Methodological 104, 501-521, 2017
232017
Dimension reduction by minimum error minimax probability machine
S Song, Y Gong, Y Zhang, G Huang, GB Huang
IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (1), 58-69, 2016
222016
Robust k-median and k-means clustering algorithms for incomplete data
J Li, S Song, Y Zhang, Z Zhou
Mathematical Problems in Engineering 2016, 2016
212016
A hybrid genetic algorithm for two-stage multi-item inventory system with stochastic demand
Y Zhang, S Song, H Zhang, C Wu, W Yin
Neural Computing and Applications 21 (6), 1087-1098, 2012
172012
Exact Algorithms for Distributionally β-Robust Machine Scheduling with Uncertain Processing Times
Y Zhang, ZJM Shen, S Song
INFORMS Journal on Computing 30 (4), 662-676, 2018
152018
Distributionally robust single machine scheduling with the total tardiness criterion
S Niu, S Song, JY Ding, Y Zhang, R Chiong
Computers & Operations Research 101, 13-28, 2019
132019
Parametric search for the bi-attribute concave shortest path problem
Y Zhang, ZJM Shen, S Song
Transportation Research Part B: Methodological 94, 150-168, 2016
112016
Robust single machine scheduling with uncertain release times for minimising the maximum waiting time
F Yue, S Song, Y Zhang, JND Gupta, R Chiong
International Journal of Production Research 56 (16), 5576-5592, 2018
102018
Dynamic programming and heuristic for stochastic uncapacitated lot-sizing problems with incremental quantity discount
Y Zhang, S Song, C Wu, W Yin
Mathematical Problems in Engineering 2012, 2012
102012
Robust quadratic regression and its application to energy-growth consumption problem
Y Wang, Y Zhang, F Zhang, J Yi
Mathematical Problems in Engineering 2013, 2013
92013
Supply chain coordination with a risk-averse retailer and a combined buy-back and revenue sharing contract
H Zhao, S Song, Y Zhang, JND Gupta, AG Devlin, R Chiong
Asia-Pacific Journal of Operational Research 36 (05), 1950028, 2019
72019
A new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterion
V Riahi, R Chiong, Y Zhang
Computers & Operations Research 117, 104839, 2020
62020
A robust fuzzy c-means clustering algorithm for incomplete data
J Li, S Song, Y Zhang, K Li
Intelligent Computing, Networked Control, and Their Engineering Applications …, 2017
52017
A robust probability classifier based on the modified-distance
Y Wang, Y Zhang, J Yi, H Qu, J Miu
Mathematical Problems in Engineering 2014, 2014
42014
Wasserstein distributionally robust shortest path problem
Z Wang, K You, S Song, Y Zhang
European Journal of Operational Research 284 (1), 31-43, 2020
32020
Optimal decisions of a supply chain with a risk-averse retailer and portfolio contracts
H Zhao, S Song, Y Zhang, JND Gupta, AG Devlin
IEEE Access 7, 123877-123892, 2019
32019
Stochastic optimization of two-stage multi-item inventory system with hybrid genetic algorithm
Y Zhang, S Song, C Wu, W Yin
Life System Modeling and Intelligent Computing, 484-492, 2010
32010
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20