Follow
M Arslan Ornek
M Arslan Ornek
Verified email at yasar.edu.tr
Title
Cited by
Cited by
Year
A simulation based experimental design to analyze factors affecting production flow time
BY Ekren, AM Ornek
Simulation Modelling Practice and Theory 16 (3), 278-293, 2008
742008
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
Journal of Manufacturing Systems 36, 147-158, 2015
382015
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18 (3), 434-469, 2013
382013
Simulation analysis of lot streaming in job shops with transportation queue disciplines
RS Edis, A Ornek
Simulation Modelling Practice and Theory 17 (2), 442-453, 2009
382009
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
352009
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
302010
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
272010
Capacitated lot sizing with alternative routings and overtime decisions
AM Ornek, O Cengiz
International Journal of Production Research 44 (24), 5363-5389, 2006
272006
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
262014
A tabu search-based heuristic for single-product lot streaming problems in flow shops
R Sancar Edis, MA Ornek
The International Journal of Advanced Manufacturing Technology 43 (11), 1202 …, 2009
252009
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67 (9), 2577-2591, 2013
232013
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
KE Kabak, AM Ornek
Computers & Industrial Engineering 56 (2), 691-707, 2009
212009
The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems
MA Ornek, PI Collier
International Journal of Operations & Production Management, 1988
201988
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
182016
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
172012
Determining optimum (s, S) levels of floor stock items in a paint production environment
BY Ekren, MA Ornek
Simulation Modelling Practice and Theory 57, 133-141, 2015
152015
A note on “A mixed integer programming model for advanced planning and scheduling (APS)”
A Örnek, S Özpeynirci, C Öztürk
European Journal of Operational Research 203 (3), 784-785, 2010
132010
Integer and constraint programming model formulations for flight-gate assignment problem
MA Ornek, C Ozturk, I Sugut
Operational Research, 1-29, 2020
92020
A mathematical model for energy and in-process inventory assessment in a manufacturing system
PI Collier, A Ornek
Applied Energy 13 (4), 265-280, 1983
81983
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Ozturk, S Tunali, B Hnich, A Ornek
International Journal of Advanced Manufacturing Technology 67 (9-12), 2577-2591, 2013
72013
The system can't perform the operation now. Try again later.
Articles 1–20