Follow
Bahram Sadeghpour Gildeh
Bahram Sadeghpour Gildeh
Professor of Statistics, Ferdowsi University of Mashhad
Verified email at um.ac.ir - Homepage
Title
Cited by
Cited by
Year
Acceptance single sampling plan with fuzzy parameter
B Sadeghpour Gildeh, E Baloui Jamkhaneh, G Yari
Iranian Journal of Fuzzy Systems 8 (2), 47-55, 2011
632011
Computing a fuzzy shortest path in a network with mixed fuzzy arc lengths using α-cuts
A Tajdin, I Mahdavi, N Mahdavi-Amiri, B Sadeghpour-Gildeh
Computers & Mathematics with Applications 60 (4), 989-1002, 2010
622010
Inspection error and its effects on single sampling plans with fuzzy parameters
E Baloui Jamkhaneh, B Sadeghpour-Gildeh, G Yari
Structural and multidisciplinary Optimization 43, 555-560, 2011
502011
A general fuzzy TOPSIS model in multiple criteria decision making
I Mahdavi, A Heidarzade, B Sadeghpour-Gildeh, N Mahdavi-Amiri
The International Journal of Advanced Manufacturing Technology 45, 406-420, 2009
452009
A new generation of process capability indices based on fuzzy measurements
A Parchami, B Sadeghpour-Gildeh, M Nourbakhsh, M Mashinchi
Journal of Applied Statistics 41 (5), 1122-1136, 2014
382014
Acceptance double sampling plan using fuzzy poisson distribution
EB Jamkhaneh, BS Gildeh
World Appl. Sci. J 16 (11), 1578-1588, 2012
382012
Comparison of Cp, Cpk and Cp- tilde process capability indices in the case of measurement error occurrence
B Sadeghpour Gildeh
10th IFSA World Congress, 2003
312003
La distance-Dp, q et le cofficient de corrélation entre deux variables aléatoires floues
B Sadeghpour Gildeh, D Gien
Actes de LFA 1, 97-102, 2001
302001
Sequential sampling plan using fuzzy SPRT
EB Jamkhaneh, BS Gildeh
Journal of Intelligent & Fuzzy Systems 25 (3), 785-791, 2013
282013
Uncertain random portfolio selection based on risk curve
R Mehralizade, M Amini, B Sadeghpour Gildeh, H Ahmadzade
Soft Computing 24, 13331-13345, 2020
262020
Designing a multiple deferred state attribute sampling plan in a fuzzy environment
R Afshari, B Sadeghpour Gildeh
American Journal of Mathematical and Management Sciences 36 (4), 328-345, 2017
262017
Fuzzy tolerance region and process capability analysis
BS Gildeh, V Moradi
Fuzzy engineering and operations research, 183-193, 2012
262012
Acceptance double sampling plan with fuzzy parameter
EB Jamkhaneh, B Sadeghpour-Gildeh, G Yari
11th Joint International Conference on Information Sciences, 1-9, 2008
262008
Optimal design of overall yield-based variable repetitive sampling plans for processes with multiple characteristics
AA Nadi, BS Gildeh, R Afshari
Applied Mathematical Modelling 81, 194-210, 2020
242020
Multiple deferred state sampling plan with fuzzy parameter
R Afshari, B Sadeghpour Gildeh, M Sarmad
International Journal of Fuzzy Systems 20, 549-557, 2018
242018
Acceptance single sampling plan with fuzzy parameter with the using of Poisson distribution
EB Jamkhaneh, B Sadeghpour-Gildeh, G Yari
World Academy of Science, Engineering and Technology 49, 1017-1021, 2009
242009
Sign control chart based on ranked set sampling
S Asghari, B Sadeghpour Gildeh, J Ahmadi, G Mohtashami Borzadaran
Quality Technology & Quantitative Management 15 (5), 568-588, 2018
232018
Fuzzy multiple deferred state attribute sampling plan in the presence of inspection errors
R Afshari, B Sadeghpour Gildeh, M Sarmad
Journal of Intelligent & Fuzzy Systems 33 (1), 503-514, 2017
232017
A group multiple dependent state sampling plan using truncated life test for the Weibull distribution
A Ahmadi Nadi, B Sadeghpour Gildeh
Quality Engineering 31 (4), 553-563, 2019
222019
An optimal planned replacement time based on availability and cost functions for a system subject to three types of failures
F Safaei, J Ahmadi, BS Gildeh
Computers & Industrial Engineering 124, 77-87, 2018
212018
The system can't perform the operation now. Try again later.
Articles 1–20