Follow
Ahmed WA Hammad
Title
Cited by
Cited by
Year
Integrated optimization with building information modeling and life cycle assessment for generating energy efficient buildings
M Najjar, K Figueiredo, AWA Hammad, A Haddad
Applied Energy 250, 1366-1382, 2019
1772019
BIM adoption model for small and medium construction organisations in Australia
Y Hong, AWA Hammad, S Sepasgozar, A Akbarnezhad
Engineering, Construction and Architectural Management 26 (2), 154-183, 2018
1542018
A multi-objective mixed integer nonlinear programming model for construction site layout planning to minimise noise pollution and transport costs
AWA Hammad, A Akbarnezhad, D Rey
Automation in construction 61, 73-85, 2016
1422016
Image-based crack detection methods: A review
HS Munawar, AWA Hammad, A Haddad, CAP Soares, ST Waller
Infrastructures 6 (8), 115, 2021
1412021
Sustainable material choice for construction projects: A Life Cycle Sustainability Assessment framework based on BIM and Fuzzy-AHP
K Figueiredo, R Pierott, AWA Hammad, A Haddad
Building and Environment 196, 107805, 2021
1392021
Remote sensing methods for flood prediction: A review
HS Munawar, AWA Hammad, ST Waller
Sensors 22 (3), 960, 2022
912022
Smart buildings: Systems and drivers
MM Froufe, CK Chinelli, ALA Guedes, AN Haddad, AWA Hammad, ...
Buildings 10 (9), 153, 2020
872020
Disruptive technologies as a solution for disaster risk management: A review
HS Munawar, M Mojtahedi, AWA Hammad, A Kouzani, MAP Mahmud
Science of the total environment 806, 151351, 2022
852022
Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors
AWA Hammad, A Akbarnezhad, P Wu, X Wang, A Haddad
Journal of Cleaner Production 228, 1264-1281, 2019
852019
A review on flood management technologies related to image processing and machine learning
HS Munawar, AWA Hammad, ST Waller
Automation in Construction 132, 103916, 2021
802021
Smart and Sustainable Cities: The Main Guidelines of City Statute for Increasing the Intelligence of Brazilian Cities.
EG Lima, CK Chinelli, ALA Guedes, EG Vazquez, AWA Hammad, ...
Sustainability (2071-1050) 12 (3), 2020
802020
Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design
MK Najjar, K Figueiredo, ACJ Evangelista, AWA Hammad, VWY Tam, ...
International Journal of Construction Management 22 (4), 541-555, 2022
722022
A computational method for estimating travel frequencies in site layout planning
AWA Hammad, A Akbarnezhad, D Rey, ST Waller
Journal of construction engineering and management 142 (5), 04015102, 2016
582016
Multiple dimensions of smart cities’ infrastructure: A review
APP Kasznar, AWA Hammad, M Najjar, E Linhares Qualharini, ...
Buildings 11 (2), 73, 2021
572021
Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs
ZS Moussavi Nadoushani, AWA Hammad, A Akbarnezhad
Journal of Construction Engineering and Management 143 (1), 04016089, 2017
562017
A neural network approach to predicting the net costs associated with BIM adoption
Y Hong, AWA Hammad, A Akbarnezhad, M Arashpour
Automation in construction 119, 103306, 2020
502020
Integrating parametric analysis with building information modeling to improve energy performance of construction projects
MK Najjar, VWY Tam, LT Di Gregorio, ACJ Evangelista, AWA Hammad, ...
Energies 12 (8), 1515, 2019
502019
Evaluation of 4D BIM tools applicability in construction planning efficiency
SS Martins, ACJ Evangelista, AWA Hammad, VWY Tam, A Haddad
International Journal of Construction Management 22 (15), 2987-3000, 2022
482022
Sustainable urban facility location: Minimising noise pollution and network congestion
AWA Hammad, A Akbarnezhad, D Rey
Transportation research part E: logistics and transportation review 107, 38-59, 2017
482017
Assessing the usability of blockchain for sustainability: Extending key themes to the construction industry
K Figueiredo, AWA Hammad, A Haddad, VWY Tam
Journal of Cleaner Production 343, 131047, 2022
472022
The system can't perform the operation now. Try again later.
Articles 1–20