Follow
Nelson Morales
Nelson Morales
Advanced Mining Technology Center & Department of Mining Engineering, University of Chile
Verified email at amtc.uchile.cl
Title
Cited by
Cited by
Year
Hardness and approximation of gathering in static radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Perennes
Parallel Processing Letters 16 (02), 165-183, 2006
802006
Aggregation heuristic for the open-pit block scheduling problem
E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes
European Journal of Operational Research 249 (3), 1169-1177, 2016
722016
On the complexity of bandwidth allocation in radio networks
R Klasing, N Morales, S Pérennes
Theoretical Computer Science 406 (3), 225-239, 2008
452008
Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning
N Morales, S Seguel, A Cáceres, E Jélvez, M Alarcón
Minerals 9 (2), 108, 2019
362019
Panel caving scheduling under precedence constraints considering mining system
M Smoljanovic, E Rubio, N Morales
35th APCOM Symposium, Wollongong, NSW, Australia, 407-417, 2011
272011
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
E Jélvez, N Morales, P Nancel-Penard, F Cornillier
Omega 94, 102046, 2020
192020
Stochastic open-pit mine production scheduling: A case study of an iron deposit
M Maleki, E Jélvez, X Emery, N Morales
Minerals 10 (7), 585, 2020
182020
A simulation–optimization framework for short-term underground mine production scheduling
F Manríquez, J Pérez, N Morales
Optimization and Engineering 21 (3), 939-971, 2020
152020
Open pit mine planning considering geomechanical fundamentals
A Parra, N Morales, J Vallejos, PMV Nguyen
International Journal of Mining, Reclamation and Environment 32 (4), 221-238, 2018
142018
Gathering in specific radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Pérennes
Huitiemes Rencontres Francophones sur les Aspects Algorithmiques des …, 2006
142006
A two-stage stochastic model for open pit mine planning under geological uncertainty
E Moreno, X Emery, M Goycoolea, N Morales, G Nelis
Proceedings of the 38th International Symposium on the Application of …, 2017
132017
Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process
N Morales, P Reyes
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
132016
A new model for automated pushback selection
E Jélvez, N Morales, H Askari-Nasab
Computers & Operations Research 115, 104456, 2020
122020
Optimizing open-pit block scheduling with exposed ore reserve
J Saavedra-Rosas, E Jeivez, J Amaya, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
122016
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling
N Morales, E Jélvez, P Nancel-Penard, A Marinho, O Guimarães
Application of Computers and Operations Research in the Mineral Industry …, 2015
122015
Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty
E Vargas, N Morales, X Emery
Proceedings of the 3rd International Symposium on Block and Sublevel Caving …, 2014
112014
Eight-dimensional planning: construction of an integrated model for the mine planning involving constructability
W Rocher, E Rubio, N Morales
Proceedings 35th International Symposium on Application of Computers in the …, 2011
112011
Application of optimized models through direct block scheduling in traditional mine planning
PHA Campos, CE Arroyo, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 118 (4 …, 2018
102018
Comparison of different approaches to strategic open-pit mine planning under geological uncertainty
G Nelis, N Morales, E Widzyk-Capehart
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
92019
A mathematical model for the scheduling and definition of mining cuts in short-term mine planning
G Nelis, N Morales
Optimization and Engineering 23 (1), 233-257, 2022
82022
The system can't perform the operation now. Try again later.
Articles 1–20