Joris Wagenaar
Joris Wagenaar
Assistant Professor, Tilburg University
No hay ninguna dirección de correo electrónico verificada.
Título
Citado por
Citado por
Año
An overview of recovery models and algorithms for real-time railway rescheduling
V Cacchiani, D Huisman, M Kidd, L Kroon, P Toth, L Veelenturf, ...
Transportation Research Part B: Methodological 63, 15-37, 2014
5462014
Real-time high-speed train rescheduling in case of a complete blockage
S Zhan, LG Kroon, LP Veelenturf, JC Wagenaar
Transportation Research Part B: Methodological 78, 182-201, 2015
1262015
Application of an iterative framework for real-time railway rescheduling
T Dollevoet, D Huisman, LG Kroon, LP Veelenturf, JC Wagenaar
Computers & Operations Research 78, 203-217, 2017
432017
A comparison of two exact methods for passenger railway rolling stock (re) scheduling
JT Haahr, JC Wagenaar, LP Veelenturf, LG Kroon
Transportation Research Part E: Logistics and Transportation Review 91, 15-32, 2016
402016
Flexible connections in PESP models for cyclic passenger railway timetabling
LG Kroon, LWP Peeters, JC Wagenaar, RA Zuidwijk
Transportation Science 48 (1), 136-154, 2014
382014
Rolling stock rescheduling in passenger railway transportation using dead-heading trips and adjusted passenger demand
J Wagenaar, L Kroon, I Fragkos
Transportation Research Part B: Methodological 101, 140-161, 2017
252017
Maintenance appointments in railway rolling stock rescheduling
JC Wagenaar, LG Kroon, M Schmidt
Transportation Science 51 (4), 1138-1160, 2017
242017
Optimization methods for the train unit shunting problem
JT Haahr, RM Lusby, JC Wagenaar
European Journal of Operational Research 262 (3), 981-995, 2017
222017
Integrated decision support tools for disruption management
N Besinovic, V Cacchiani, T Dollevoet, RMP Goverde, D Huisman, ...
RailTokyo 2015, 6th International Conference on Railway Operations Modelling …, 2015
62015
A robust and energy-efficient train timetable for the subway system
P Liu, M Schmidt, Q Kong, JC Wagenaar, L Yang, Z Gao, H Zhou
Transportation Research Part C: Emerging Technologies 121, 102822, 2020
52020
A comparison of optimization methods for solving the depot matching and parking problem
J Haahr, R Lusby, J Wagenaar
ERIM report series research in management Erasmus Research Institute of …, 2015
52015
Maintenance in railway rolling stock rescheduling for passenger railways
J Wagenaar, LG Kroon
ERIM Report Series Reference No. ERS-2015-002-LIS, 2015
42015
A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re) Scheduling
J Wagenaar, L Veelenturf, L Kroon
32015
Consumption order formulations for lot-sizing problems
JC Wagenaar
Erasmus School of Economics, Roterdão, Holanda, 2010
22010
An Overview of Recovery Models for Real-time Railway Rescheduling
V Cacchiani, D Huisman, M Kidd, L Kroon, P Toth, L Veelenturf, ...
Econometric Institute Research Papers, 2013
12013
Optimal depot locations for humanitarian logistics service providers using robust optimization
VF Stienen, JC Wagenaar, D den Hertog, HA Fleuren
Omega 104, 102494, 2021
2021
Forecasting the spread of SARS-CoV-2 is inherently ambiguous given the current state of virus research
M Koenen, M Balvert, R Brekelmans, H Fleuren, V Stienen, J Wagenaar
PloS one 16 (3), e0245519, 2021
2021
Integrated Planning for Multimodal Networks with Disruptions and Customer Service Requirements
J Wagenaar, I Fragkos, R Zuidwijk
Transportation Science 55 (1), 196-221, 2021
2021
Practice Oriented Algorithmic Disruption Management in Passenger Railways
J Wagenaar
2016
Disruption management in passenger railway networks
J Wagenaar
RSM Discovery-Management Knowledge 28 (4), 20-22, 2016
2016
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20