Seguir
Salvador Senent
Salvador Senent
Dirección de correo verificada de upm.es
Título
Citado por
Citado por
Año
Tunnel face stability in heavily fractured rock masses that follow the Hoek–Brown failure criterion
S Senent, G Mollon, R Jimenez
International Journal of Rock Mechanics and Mining Sciences 60, 440-451, 2013
1472013
A tunnel face failure mechanism for layered ground, considering the possibility of partial collapse
S Senent, R Jimenez
Tunnelling and Underground Space Technology 47, 182-192, 2015
1402015
Distinct element method simulations of rock-concrete interfaces under different boundary conditions
JG Gutiérrez-Ch, S Senent, S Melentijevic, R Jimenez
Engineering Geology 240, 123-139, 2018
1002018
Reliability analysis of circular tunnel face stability obeying Hoek–Brown failure criterion considering different distribution types and correlation structures
P Zeng, S Senent, R Jimenez
Journal of Computing in Civil Engineering 30 (1), 04014126, 2016
672016
Reliability analysis of circular tunnel face stability obeying Hoek–Brown failure criterion considering different distribution types and correlation structures
P Zeng, S Senent, R Jimenez
Journal of Computing in Civil Engineering 30 (1), 04014126, 2016
672016
Structure from Motion photogrammetry to characterize underground rock masses: Experiences from two real tunnels
R García-Luna, S Senent, R Jurado-Piña, R Jimenez
Tunnelling and Underground Space Technology 83, 262-273, 2019
642019
Prediction of time-dependent tunnel convergences using a Bayesian updating approach
X Feng, R Jimenez, P Zeng, S Senent
Tunnelling and Underground Space Technology 94, 103118, 2019
352019
DEM simulation of rock creep in tunnels using Rate Process Theory
JG Gutiérrez-Ch, S Senent, P Zeng, R Jimenez
Computers and Geotechnics 142, 104559, 2022
342022
A DEM-based factor to design rock-socketed piles considering socket roughness
JG Gutiérrez-Ch, S Senent, S Melentijevic, R Jimenez
Rock Mechanics and Rock Engineering 54 (7), 3409-3421, 2021
232021
An upper bound solution for tunnel face stability analysis considering the free span
S Senent, C Yi, R Jimenez
Tunnelling and Underground Space Technology 103, 103515, 2020
232020
Effect of advance drainage on tunnel face stability using Limit Analysis and numerical simulations
C Yi, S Senent, R Jimenez
Tunnelling and Underground Space Technology 93, 103105, 2019
222019
Numerical simulation of the influence of small-scale defects on the true-triaxial strength of rock samples
S Senent, R Jimenez, A Reyes
Computers and Geotechnics 53, 142-156, 2013
202013
Distinct-element method simulations of rock-socketed piles: estimation of side shear resistance considering socket roughness
JG Gutiérrez-Ch, S Melentijevic, S Senent, R Jimenez
Journal of Geotechnical and Geoenvironmental Engineering 146 (12), 04020133, 2020
192020
Discrete element modelling of rock creep behaviour using rate process theory
JG Gutiérrez-Ch, S Senent, E Estebanez, R Jimenez
Canadian Geotechnical Journal 58 (8), 1231-1246, 2021
172021
Rock shear creep modelling: DEM–Rate process theory approach
JG Gutiérrez-Ch, S Senent, EP Graterol, P Zeng, R Jimenez
International Journal of Rock Mechanics and Mining Sciences 161, 105295, 2023
122023
Using telephoto lens to characterize rock surface roughness in SfM models
R García-Luna, S Senent, R Jimenez
Rock Mechanics and Rock Engineering 54 (5), 2369-2382, 2021
122021
New collocation method for stochastic response surface reliability analyses
P Zeng, T Li, Y Chen, R Jimenez, X Feng, S Senent
Engineering with Computers 36, 1751-1762, 2020
122020
Sliding stability analysis of gravity dam founded on rock mass with impersistent joint set
M Cabrera, S Senent, C Olalla, R Jimenez
Canadian Geotechnical Journal 52 (11), 1668-1684, 2015
122015
DEM models to predict side shear resistance of rock-socketed piles considering socket roughness
JG Gutiérrez-Ch, S Melentijevic, S Senent, R Jimenez
ARMA US Rock Mechanics/Geomechanics Symposium, ARMA-2019-1757, 2019
62019
La estabilidad del frente de excavación de un túnel en terrenos heterogéneos o con un criterio de rotura no-lineal
S Senent Domínguez
Caminos, 2015
42015
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20