Seguir
L. Eduardo Izquierdo
L. Eduardo Izquierdo
FPC
Dirección de correo verificada de fpc.cl
Título
Citado por
Citado por
Año
A bidirectional and homogeneous tuned mass damper: A new device for passive control of vibrations
JL Almazán, C Juan, JA Inaudi, D López-García, LE Izquierdo
Engineering Structures 29 (7), 1548-1560, 2007
902007
Feedforward control of multistage assembly processes using programmable tooling
LE Izquierdo, J Shi, SJ Hu, CW Wampler
Trans. NAMRI/SME 35, 295-302, 2007
492007
Multiobjective optimization for integrated tolerance allocation and fixture layout design in multistation assembly
Z Li, LE Izquierdo, M Kokkolaras, SJ Hu, PY Papalambros
352008
A methodology for estimation of the specific rock energy index using corrected down-the-hole drill monitoring data
LE Izquierdo, LE Chiang
Mining Technology 113 (4), 225-236, 2004
312004
Robust fixture layout design for a product family assembled in a multistage reconfigurable line
LE Izquierdo, SJ Hu, H Du, R Jin, H Jee, J Shi
292009
Part-by-part dimensional error compensation in compliant sheet metal assembly processes
K Xie, JA Camelio, LE Izquierdo
Journal of Manufacturing Systems 31 (2), 152-161, 2012
242012
Functional process adjustments to reduce no-fault-found product failures in service caused by in-tolerance faults
LE Izquierdo, D Ceglarek
CIRP annals 58 (1), 37-40, 2009
162009
Stabilization of the emulsion of Alkenyl Succinic Anhydride (ASA) in water using cellulose nanofibrils
F Arancibia, E Izquierdo, M Pereira
Chemical Engineering Science 233, 116407, 2021
102021
Optimization of localized annealing for preform anneal forming of aluminum alloys
J Li, Y Zhou, SJ Hu, LE Izquierdo, PE Krajewski, TM Lee
38th Annual North American Manufacturing Research Conference, NAMRC 38, 411-418, 2010
32010
Self-resilient production systems: going beyond design robustness
D Ceglarek, P Prakash, T Phoomboplab, LE Izquierdo
22009
Dimensional Error Compensation in Compliant Assembly Processes Using Virtual Assembly Training
K Xie, JA Camelio, LE Izquierdo
International Manufacturing Science and Engineering Conference 48517, 503-512, 2008
12008
Synthesis of Products, Processes and Control for Dimensional Quality in Reconfigurable Assembly Systems.
LE Izquierdo
2007
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–12