Jørgen Thorlund Haahr
Jørgen Thorlund Haahr
QAMPO
Dirección de correo verificada de qampo.com
Título
Citado por
Citado por
Año
A dynamic programming approach for optimizing train speed profiles with speed restrictions and passage points
JT Haahr, D Pisinger, M Sabbaghian
Transportation Research Part B: Methodological 99, 167-182, 2017
592017
A branch-and-price algorithm for railway rolling stock rescheduling
RM Lusby, JT Haahr, J Larsen, D Pisinger
Transportation Research Part B: Methodological 99, 228-250, 2017
51*2017
A comparison of two exact methods for passenger railway rolling stock (re) scheduling
JT Haahr, JC Wagenaar, LP Veelenturf, LG Kroon
Transportation Research Part E: Logistics and Transportation Review 91, 15-32, 2016
392016
Optimization methods for the train unit shunting problem
JT Haahr, RM Lusby, JC Wagenaar
European Journal of Operational Research 262 (3), 981-995, 2017
26*2017
Integrating rolling stock scheduling with train unit shunting
J Haahr, RM Lusby
European Journal of Operational Research 259 (2), 452-468, 2017
222017
A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards
JT Haahr, RM Lusby
Networks 67 (2), 126-138, 2016
152016
Heuristic methods for single link shared backup path protection
JT Haahr, T Stidsen, M Zachariasen
Journal of Heuristics 20 (5), 539-560, 2014
10*2014
Reactive robustness and integrated approaches for railway optimization problems
JT Haahr, D Pisinger, J Larsen
Unpublished doctoral thesis, DTU Management Engineering, Technical …, 2015
72015
Exact methods for solving the train departure matching problem
JT Haahr, SH Bull
IFORS, 2014
62014
Train delay prediction in the netherlands through neural networks
JT Haahr, EO Hellsten, E van der Hurk
32019
A math-heuristic framework for the ROADEF/EURO challenge 2014
JT Haahr, SH Bull
DTU Management Engineering Tech. Rep., 2014
22014
Modeling and solution methods for the energy-efficient train timetables problem
J Haahr, M Kidd
Technical report. Technical University of Denmark, 2015
12015
Train Delay Prediction in the Netherlands through Neural Networks-DTU Orbit (06/10/2019)
JT Haahr, EO Hellsten, E van der Hurk
2019
A Framework for Railway Rolling Stock Rescheduling
RM Lusby, JT Haahr, J Larsen, D Pisinger
Rolling Stock 5, 11, 2013
2013
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–14