Gursel Suer
Gursel Suer
Professor of Industrial and Systems Engineering, Ohio University
Dirección de correo verificada de ohio.edu
Título
Citado por
Citado por
Año
Optimal operator assignment and cell loading in labor-intensive manufacturing cells
GA Süer
Computers & industrial engineering 31 (1-2), 155-158, 1996
971996
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
D Castro-Lacouture, GA Süer, J Gonzalez-Joaqui, JK Yates
Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009
902009
Designing parallel assembly lines
GA Süer
Computers & industrial engineering 35 (3-4), 467-470, 1998
831998
Design of dedicated, shared and remainder cells in a probabilistic demand environment
GA Süer, J Huang, S Maddisetty
International journal of production research 48 (19), 5613-5646, 2010
752010
Optimal operator assignment and cell loading when lot-splitting is allowed
GA Süer, IS Bera
Computers & Industrial Engineering 35 (3-4), 431-434, 1998
721998
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
GA Süer, RR Tummaluri
International Journal of Production Research 46 (2), 469-493, 2008
692008
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
GA Süer, C Dagli
Computers & Industrial Engineering 48 (3), 643-655, 2005
682005
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells
GA Suer, F Arikan, C Babayigit
Proceedings of the 35th International Conference on Computers and Industrial …, 2005
66*2005
Stochastic skill-based manpower allocation in a cellular manufacturing system
G Egilmez, B Erenay, GA Süer
Journal of Manufacturing Systems 33 (4), 578-588, 2014
632014
Stochastic cellular manufacturing system design subject to maximum acceptable risk level
G Egilmez, GA Süer, J Huang
Computers & Industrial Engineering 63 (4), 842-854, 2012
632012
Evaluation of manufacturing cell loading rules for independent cells
GA Suer, M Saiz, W Gonzalez
International Journal of Production Research 37 (15), 3445-3468, 1999
621999
Minimizing the number of tardy jobs in identical machine scheduling
GA Süer, E Báez, Z Czajkiewicz
Computers & industrial engineering 25 (1-4), 243-246, 1993
511993
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
J Huang, GA Süer
Computers & Industrial Engineering 86, 29-42, 2015
502015
Manufacturing cell loading rules and algorithms for connected cells
GA Süer, M Saiz, C Dagli, W Gonzalez
Manufacturing Research and Technology 24, 97-127, 1995
461995
Models for cell loading and product sequencing in labor-intensive cells
GA Süer, J Cosner, A Patten
Computers & Industrial Engineering 56 (1), 97-105, 2009
452009
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
X Hao, M Gen, L Lin, GA Suer
Journal of intelligent Manufacturing 28 (3), 833-845, 2017
402017
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
GA Süer, F Arikan, C Babayiğit
International Journal of Production Research 46 (2), 371-404, 2008
402008
Heuristic procedures and mathematical models for cell loading and scheduling in a shoe manufacturing company
GA Süer, A Subramanian, J Huang
Computers & Industrial Engineering 56 (2), 462-475, 2009
392009
The impact of risk on the integrated cellular design and control
G Egilmez, G Süer
International Journal of Production Research 52 (5), 1455-1478, 2014
372014
A hybrid approach of genetic algorithms and local optimizers in cell loading
GA Süer, R Vazquez, M Cortes
Computers & Industrial Engineering 48 (3), 625-641, 2005
352005
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20