Automatic BIM component extraction from point clouds of existing buildings for sustainability applications C Wang, YK Cho, C Kim Automation in Construction 56, 1-13, 2015 | 373 | 2015 |
Smart Scanning and Near Real-Time 3D Surface Modeling of Dynamic Construction Equipment from A Point Cloud C Wang, Y Cho Automation in Construction, 2014 | 115 | 2014 |
As-is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system C Wang, YK Cho, M Gai Journal of Computing in Civil Engineering 27 (6), 645-656, 2013 | 111 | 2013 |
ANN-based automated scaffold builder activity recognition through wearable EMG and IMU sensors SS Bangaru, C Wang, SA Busam, F Aghazadeh Automation in Construction 126, 103653, 2021 | 110 | 2021 |
Scanning electron microscopy (SEM) image segmentation for microstructure analysis of concrete using U-net convolutional neural network SS Bangaru, C Wang, X Zhou, M Hassan Automation in Construction 144, 104602, 2022 | 70 | 2022 |
Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms A Ebrahimi, HW Jeon, S Lee, C Wang Computers & Industrial Engineering 141, 106295, 2020 | 63 | 2020 |
Effects of a passive upper extremity exoskeleton for overhead tasks P Yin, L Yang, S Qu, C Wang Journal of Electromyography and Kinesiology 55, 102478, 2020 | 61 | 2020 |
Estimation of the degree of hydration of concrete through automated machine learning based microstructure analysis–A study on effect of image magnification SS Bangaru, C Wang, M Hassan, HW Jeon, T Ayiluri Advanced Engineering Informatics 42, 100975, 2019 | 57 | 2019 |
Performance evaluation of automatically generated BIM from laser scanner data for sustainability analyses C Wang, YK Cho Procedia engineering 118, 918-925, 2015 | 52 | 2015 |
Data quality and reliability assessment of wearable EMG and IMU sensor for construction activity recognition SS Bangaru, C Wang, F Aghazadeh Sensors 20 (18), 5264, 2020 | 49 | 2020 |
3D printing in construction: current status, implementation hindrances, and development agenda X Ning, T Liu, C Wu, C Wang Advances in Civil Engineering 2021 (1), 6665333, 2021 | 44 | 2021 |
Effects of wearable power assist device on low back fatigue during repetitive lifting tasks P Yin, L Yang, C Wang, S Qu Clinical Biomechanics 70, 59-65, 2019 | 42 | 2019 |
Target-focused local workspace modeling for construction automation applications YK Cho, C Wang, P Tang, CT Haas Journal of Computing in Civil Engineering 26 (5), 661-670, 2012 | 42 | 2012 |
An agent-based simulation of occupancy schedule in office buildings S Norouziasl, A Jafari, C Wang Building and Environment 186, 107352, 2020 | 41 | 2020 |
3D thermal modeling for existing buildings using hybrid LIDAR system Y Cho, C Wang Computing in Civil Engineering (2011), 552-559, 2011 | 31 | 2011 |
Application of assistive wearable robotics to alleviate construction workforce shortage: Challenges and opportunities C Wang, L Ikuma, J Hondzinski, M de Queiroz Computing in Civil Engineering 2017, 358-365, 2017 | 29 | 2017 |
A range free localization algorithm based on restricted-area for wireless sensor networks C Wang, K Liu, N Xiao 2008 The Third International Multi-Conference on Computing in the Global …, 2008 | 29 | 2008 |
Automated and continuous fatigue monitoring in construction workers using forearm EMG and IMU wearable sensors and recurrent neural network SS Bangaru, C Wang, F Aghazadeh Sensors 22 (24), 9729, 2022 | 28 | 2022 |
BIM-based construction noise hazard prediction and visualization for occupational safety and health awareness improvement W Wei, C Wang, Y Lee Computing in Civil Engineering 2017, 262-269, 2017 | 25 | 2017 |
Application of as-built data in building retrofit decision making process C Wang, YK Cho Procedia engineering 118, 902-908, 2015 | 25 | 2015 |