Seguir
Marzieh Hashemi
Marzieh Hashemi
Dirección de correo verificada de sci.ui.ac.ir
Título
Citado por
Citado por
Año
Optimal maintenance policies for coherent systems with multi-type components
M Hashemi, M Asadi, S Zarezadeh
Reliability Engineering & System Safety 195, 106674, 2020
422020
Constitutive modeling of a schistose rock in the Himalaya
A Varadarajan, KG Sharma, CS Desai, M Hashemi
International Journal of Geomechanics 1 (1), 83-107, 2001
302001
Analysis of a Powerhouse Cavern in the Himalaya
A Varadarajan, KG Sharma, CS Desai, M Hashemi
International Journal of Geomechanics 1 (1), 109-127, 2001
242001
Some properties of the residual lifetime of progressively Type-II right censored order statistics
M Hashemi, M Tavangar, M Asadi
Statistics & probability letters 80 (9-10), 848-859, 2010
212010
Reliability and maintenance analysis of coherent systems subject to aging and environmental shocks
M Tavangar, M Hashemi
Reliability Engineering & System Safety 218, 108170, 2022
202022
Optimal preventive maintenance of coherent systems: A generalized Pólya process approach
M Hashemi, M Asadi
IISE Transactions 53 (11), 1266-1280, 2021
202021
An overview of some classical models and discussion of the signature‐based models of preventive maintenance
M Asadi, M Hashemi, N Balakrishnan
Applied Stochastic Models in Business and Industry 39 (1), 4-53, 2023
192023
Optimal preventive maintenance for coherent systems whose failure occurs due to aging or external shocks
M Hashemi, M Tavangar, M Asadi
Computers & Industrial Engineering 163, 107829, 2022
182022
Optimal maintenance strategies for coherent systems: A warranty dependent approach
M Hashemi, M Asadi, M Tavangar
Reliability Engineering & System Safety 217, 108027, 2022
172022
On component failure in coherent systems with applications to maintenance strategies
M Hashemi, M Asadi
Advances in Applied Probability 52 (4), 1197-1223, 2020
162020
Some characterization results on generalized Pareto distribution based on progressive Type-II right censoring
M Hashemi, M Asadi
JOURNAL OF THE IRANIAN STATISTICAL SOCIETY (JIRSS) 6 (2), 99-110, 2007
122007
On characterizations of the generalized Pareto distributions based on progressively censored order statistics
M Tavangar, M Hashemi
Statistical Papers 54 (2), 381-390, 2013
112013
Constitutive Modelling of a Schistose Rock in the Himalaya
M Hashemi
Ph. D. Thesis submitted to Indian Institute of Technology Delhi, India, 1999
51999
On preventive maintenance scheduling for the systems exposed to aging and external shocks
M Hashemi, M Asadi, M Tavangar
Applied Stochastic Models in Business and Industry 38 (4), 590-608, 2022
22022
An overview of signature‐based preventive maintenance of coherent systems
M Asadi, M Hashemi, N Balakrishnan
Applied Stochastic Models in Business & Industry, DOI 10, 2022
12022
Rejoinder to:" An overview of some classical and discussion of the signature‐based models of preventive maintenance".
M Asadi, M Hashemi, N Balakrishnan
Applied Stochastic Models in Business & Industry 39 (1), 2023
2023
System Signatures: A Review
M Asadi, M Hashemi
Wiley StatsRef: Statistics Reference Online, 1-10, 2022
2022
Some Maintenance Policies for Coherent Systems
M Hashemi, M Asadi
Proceeding of Reliability Seminar on th 5 The Theory and its Applications, 125, 2019
2019
Strain-Softening Behaviour of a Schistoserock Under Triaxial Loading
A Varadarajan, KG Sharma, M Hashemi
ISRM Congress, ISRM-10CONGRESS-2003-222, 2003
2003
DETERMINATION OF ROCK MASS STRENGTH PARAMETERS AND STABILITY ANALYSIS FOR AN UNDERGROUND EXCAVATION SUPPORT SYSTEM, THE KHADANGESTAN WATER CONVEYANCE TUNNEL, IRAN
M HASHEMI, H BOOR
ISRM Regional Symposium, Advancing Rock Mechanics Frontiers to Meet the …, 2002
2002
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20