Seguir
Matteo Izzi
Matteo Izzi
National Research Council of Italy - Trees and Timber Institute (CNR IVALSA)
Dirección de correo verificada de ivalsa.cnr.it - Página principal
Título
Citado por
Citado por
Año
Seismic behaviour of Cross-Laminated Timber structures: A state-of-the-art review
M Izzi, D Casagrande, S Bezzi, D Pasca, M Follesa, R Tomasi
Engineering structures 170, 42-52, 2018
2062018
Prototyping and validation of MEMS accelerometers for structural health monitoring—The case study of the Pietratagliata cable-stayed bridge
C Bedon, E Bergamo, M Izzi, S Noè
Journal of Sensor and Actuator Networks 7 (3), 30, 2018
1192018
Experimental investigations and design provisions of steel-to-timber joints with annular-ringed shank nails for Cross-Laminated Timber structures
M Izzi, G Flatscher, M Fragiacomo, G Schickhofer
Construction and Building Materials 122, 446-457, 2016
862016
Investigating the hysteretic behavior of cross-laminated timber wall systems due to connections
M Izzi, A Polastri, M Fragiacomo
Journal of Structural Engineering 144 (5), 04018035, 2018
622018
Modelling the mechanical behaviour of typical wall-to-floor connection systems for cross-laminated timber structures
M Izzi, A Polastri, M Fragiacomo
Engineering structures 162, 270-282, 2018
622018
Seismic analysis of multi-storey timber buildings braced with a CLT core and perimeter shear-walls
A Polastri, M Izzi, L Pozza, C Loss, I Smith
Bulletin of earthquake engineering 17, 1009-1028, 2019
402019
A hysteresis model for timber joints with dowel-type fasteners
M Izzi, G Rinaldin, A Polastri, M Fragiacomo
Engineering Structures 157, 170-178, 2018
362018
Investigating the use of targeted‐energy‐transfer devices for stay‐cable vibration mitigation
M Izzi, L Caracoglia, S Noè
Structural Control and Health Monitoring 23 (2), 315-332, 2016
252016
Assessment of the structural stability of Blockhaus timber log-walls under in-plane compression via full-scale buckling experiments
C Bedon, G Rinaldin, M Izzi, M Fragiacomo, C Amadio
Construction and Building Materials 78, 474-490, 2015
222015
Structural performance of a hybrid timber wall system for emergency housing facilities
D Casagrande, E Sinito, M Izzi, G Pasetto, A Polastri
Journal of Building Engineering 33, 101566, 2021
182021
Low cycle ductile performance of screws used in timber structures
M Izzi, A Polastri
Construction and Building Materials 217, 416-426, 2019
102019
Evaluation of zero-strength layer depths for timber members of floor assemblies with heat resistant cavity insulations
M Tiso, A Just, J Schmid, KN Mäger, M Klippel, M Izzi, M Fragiacomo
Fire safety journal 107, 137-148, 2019
92019
Numerical modelling of steel-to-timber joints and connectors for CLT structures
M Izzi, G Rinaldin, M Fragiacomo, A Polastri
World Conference on Timber Engineering (2016), 1-9, 2016
82016
Advanced modelling of CLT wall systems for earthquake resistant timber structures
M Izzi, A Polastri, F Massimo
3rd International Network on Timber Engineering Research (INTER) Meeting, 1-14, 2016
62016
The TRE3 research project: A hybrid timber-frame wall system for emergency housing facilities
E Sinito, D Casagrande, M Izzi, A Polastri, G Pasetto, A Angeli, F Nebiolo, ...
2018 World Conference on Timber Engineering, WCTE 2018, 2018
22018
Experimental tests on a hybrid timber-frame wall system
M Izzi, D Casagrande, E Sinito, G Pasetto, A Polastri, VB CNR-IVALSA
22017
Assessing the seismic performance of screws used in timber structures by means of cyclic bending tests
M Izzi, A Polastri, F Nebiolo, C Luzzani
World Conference of Timber Engineering 2018, 2018
12018
Targeted-Energy-Transfer devices for stay-cable vibration mitigation
M Izzi, L Caracoglia, S Noè
University of Genova, 2014
12014
Mechanical characterization of connections in seismic resistant Cross-Laminated Timber structures
M Izzi
Università degli Studi di Trieste, 2017
2017
Progetto TRE3: sistema ibrido a pareti intelaiate in legno per l’edilizia di emergenza
L Franzoni, M Izzi, A Angeli, E Sinitoa, D Casagrande, G Pasetto, ...
ANIDIS 2017, 2017
2017
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20