A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems Ö Uzun Araz, L Salum International Journal of Production Research 48 (1), 251-270, 2010 | 51 | 2010 |
Using the when/where rules in dual resource constrained systems for a hybrid push-pull control L Salum, ÖU Araz International Journal of Production Research 47 (6), 1661-1677, 2009 | 51 | 2009 |
Determining the parameters of dual-card kanban system: an integrated multicriteria and artificial neural network methodology OU Araz, O Eski, C Araz The International Journal of Advanced Manufacturing Technology 38, 965-977, 2008 | 28 | 2008 |
A facility layout problem in a marble factory via simulation RS Edis, B Kahraman, ÖU Araz, MK Özfırat Mathematical and Computational Applications 16 (1), 97-104, 2011 | 23 | 2011 |
A simulation based multi-criteria scheduling approach of dual-resource constrained manufacturing systems with neural networks OU Araz Australasian Joint Conference on Artificial Intelligence, 1047-1052, 2005 | 21 | 2005 |
A reactive scheduling approach based on fuzzy inference for hybrid flowshop systems O Uzun Araz, O Eski, C Araz International Journal of Simulation Modelling 18 (1), 5-18, 2019 | 13 | 2019 |
Real-time controlled multi-objective scheduling through ANNs and fuzzy inference systems: The case of DRC manufacturing OU Araz Computational Science–ICCS 2007: 7th International Conference, Beijing …, 2007 | 9 | 2007 |
Dinamik üretim sistemleri için kanban sayısının belirlenmesi: Bütünleşik bir yöntem ÖU Araz, C Araz, Ö Eski Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 22 (4), 285-296, 2016 | 8 | 2016 |
A multi-criteria decision making procedure based on neural networks for kanban allocation ÖU Araz, Ö Eski, C Araz Advances in Neural Networks-ISNN 2006: Third International Symposium on …, 2006 | 6 | 2006 |
Storage location assignment of steel coils in a manufacturing company: an integer linear programming model and a greedy randomized adaptive search procedure EB Edis, O Uzun Araz, O Eski, R Sancar Edis Top 31 (1), 67-109, 2023 | 3 | 2023 |
İYİLEŞTİRME PROJELERİNİN BULANIK VİKOR YÖNTEMİ İLE DEĞERLENDİRİLMESİ Ö Eski, ÖU Araz Endüstri Mühendisliği 32 (3), 473-495, 2021 | 2 | 2021 |
Doğumsal aminoasit metabolizması bozukluğuna bağlı düşük proteinli beslenme tedavisi alan çocuklarda plazma eser element düzeylerinin belirlenmesi Ö Araz Sağlık Bilimleri Enstitüsü, 2017 | 2 | 2017 |
A Neural Network Based Decision Support System for Real-Time Scheduling of Flexible Manufacturing Systems DE Akyol, OU Araz Operations Research Proceedings 2007: Selected Papers of the Annual …, 2007 | 2 | 2007 |
Fuzzy demand-driven material requirements planning: a comprehensive analysis of fuzzy logic implementation in DDMRP O Uzun Araz, MA Ilgin, O Eski, C Araz International Journal of Production Research, 1-19, 2024 | | 2024 |
Determining the number of kanbans for dynamic production systems: An integrated methodology Ö Uzun Araz, C Araz, Ö Eski | | 2016 |
Dinamik üretim sistemleri için kanban sayısının belirlenmesi: Bütünleşik bir yöntem Determining the number of kanbans for dynamic production systems: An integrated methodology ÖU ARAZ, C ARAZ, Ö ESKİ | | |
International Journal of Simulation Modelling–Volume 18, Number O Uzun Araz, O Eski, C Araz | | |