Follow
Can B. Kalayci
Can B. Kalayci
Other namesCAN BERK KALAYCI
Associate Professor of Industrial Engineering, Pamukkale University
Verified email at pau.edu.tr - Homepage
Title
Cited by
Cited by
Year
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
CB Kalayci, SM Gupta
Expert Systems with Applications 40 (18), 7231-7241, 2013
2162013
Disassembly line balancing problem: a review of the state of the art and future directions
E Özceylan, CB Kalayci, A Güngör, SM Gupta
International Journal of Production Research 57 (15-16), 4805-4827, 2019
2122019
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
CB Kalayci, O Polat, SM Gupta
Annals of Operations Research 242, 321-354, 2016
1832016
An ant colony system empowered variable neighborhood search algorithm for the vehicle routing problem with simultaneous pickup and delivery
CB Kalayci, C Kaya
Expert Systems with Applications 66, 163-175, 2016
1762016
A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
CB Kalayci, SM Gupta
The International Journal of Advanced Manufacturing Technology 69 (1-4), 197-209, 2013
1742013
A perturbation based variable neighborhood search heuristic for solving the vehicle routing problem with simultaneous pickup and delivery with time limit
O Polat, CB Kalayci, O Kulak, HO Günther
European Journal of Operational Research 242 (2), 369-382, 2015
1652015
A comprehensive review of deterministic models and applications for mean-variance portfolio optimization
CB Kalayci, O Ertenlice, MA Akbay
Expert Systems with Applications 125, 345-368, 2019
1622019
A survey of swarm intelligence for portfolio optimization: Algorithms and applications
O Ertenlice, CB Kalayci
Swarm and evolutionary computation 39, 36-52, 2018
1592018
Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
CB Kalayci, A Hancilar, A Gungor, SM Gupta
Journal of Manufacturing Systems 37, 672-682, 2015
1462015
A tabu search algorithm for balancing a sequence-dependent disassembly line
CB Kalayci, SM Gupta
Production Planning & Control 25 (2), 149-160, 2014
1312014
Ant colony optimization for sequence‐dependent disassembly line balancing problem
CB Kalayci, SM Gupta
Journal of Manufacturing Technology Management 24 (3), 413-427, 2013
1302013
An artificial bee colony algorithm with feasibility enforcement and infeasibility toleration procedures for cardinality constrained portfolio optimization
CB Kalayci, O Ertenlice, H Akyer, H Aygoren
Expert Systems with Applications 85, 61-75, 2017
842017
A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study
O Polat, CB Kalayci, Ö Mutlu, SM Gupta
International Journal of Production Research 54 (3), 722-741, 2016
762016
A variable neighbourhood search algorithm for disassembly lines
CB Kalayci, O Polat, SM Gupta
Journal of Manufacturing Technology Management 26 (2), 182-194, 2015
722015
An efficient hybrid metaheuristic algorithm for cardinality constrained portfolio optimization
CB Kalayci, O Polat, MA Akbay
Swarm and Evolutionary Computation 54, 100662, 2020
682020
A parallel variable neighborhood search algorithm with quadratic programming for cardinality constrained portfolio optimization
MA Akbay, CB Kalayci, O Polat
Knowledge-Based Systems 198, 105944, 2020
632020
Simulated annealing algorithm for solving sequence-dependent disassembly line balancing problem
CB Kalayci, SM Gupta
IFAC Proceedings Volumes 46 (9), 93-98, 2013
542013
Soft computing methods for fatigue life estimation: A review of the current state and future trends
CB Kalayci, S Karagoz, Ö Karakas
Fatigue & Fracture of Engineering Materials & Structures 43 (12), 2763-2785, 2020
532020
A simulated annealing algorithm for balancing a disassembly line
CB Kalayci, SM Gupta, K Nakashima
Design for Innovative Value Towards a Sustainable Society: Proceedings of …, 2012
352012
River formation dynamics approach for sequence-dependent disassembly line balancing problem
CB Kalayci, SM Gupta
Reverse supply chains: Issues and Analysis, 289-312, 2013
322013
The system can't perform the operation now. Try again later.
Articles 1–20