Follow
Tae-Eog Lee
Tae-Eog Lee
KAIST, Department of Industrial & Systems Engineering
Verified email at kaist.ac.kr - Homepage
Title
Cited by
Cited by
Year
Scheduling analysis of time-constrained dual-armed cluster tools
JH Kim, TE Lee, HY Lee, DB Park
IEEE Transactions on Semiconductor Manufacturing 16 (3), 521-534, 2003
2922003
A three-level supply chain network design model with risk-pooling and lead times
S Park, TE Lee, CS Sung
Transportation Research Part E: Logistics and Transportation Review 46 (5 …, 2010
1712010
An extended event graph with negative places and tokens for time window constraints
TE Lee, SH Park
IEEE Transactions on Automation Science and Engineering 2 (4), 319-332, 2005
1622005
Scheduling single-armed cluster tools with reentrant wafer flows
HY Lee, TE Lee
IEEE transactions on Semiconductor Manufacturing 19 (2), 226-240, 2006
1572006
A review of scheduling theory and methods for semiconductor manufacturing cluster tools
TE Lee
2008 Winter simulation conference, 2127-2135, 2008
1512008
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
JH Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 5 (3), 490-503, 2008
1352008
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes
CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ...
European Journal of Industrial Engineering 4 5 (3), 254-271, 2011
1172011
Performance measures and schedules in periodic job shops
TE Lee, ME Posner
Operations Research 45 (1), 72-91, 1997
1161997
Workload balancing and scheduling of a single-armed cluster tool
TE Lee, HY Lee, YH Shin
APIEMS, 1-6, 2004
1142004
Modeling and implementing a real-time scheduler for dual-armed cluster tools
YH Shin, TE Lee, JH Kim, HY Lee
Computers in Industry 45 (1), 13-27, 2001
1092001
An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
C Jung, TE Lee
IEEE Transactions on Semiconductor Manufacturing 25 (2), 186-199, 2011
1072011
Scheduling cluster tools with ready time constraints for consecutive small lots
HJ Kim, JH Lee, C Jung, TE Lee
IEEE Transactions on Automation Science and Engineering 10 (1), 145-159, 2012
972012
Noncyclic scheduling of cluster tools with a branch and bound algorithm
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (2), 690-700, 2013
952013
Petri net modeling and scheduling for cyclic job shops with blocking
JS Song, TE Lee
Computers & Industrial Engineering 34 (2), 281-295, 1998
811998
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation
TK Kim, C Jung, TE Lee
International Journal of Production Research 50 (10), 2785-2795, 2012
742012
Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool
DS Sun, TE Lee, KH Kim
International Journal of Production Economics 95 (2), 245-264, 2005
652005
Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using Pareto-optimal optimization
U Wikborg, TE Lee
IEEE Transactions on Automation Science and Engineering 10 (3), 699-710, 2012
642012
Scheduling cluster tools for concurrent processing of two wafer types
JH Lee, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 11 (2), 525-536, 2014
602014
A branch and bound algorithm for cyclic scheduling of timed Petri nets
C Jung, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (1), 309-323, 2013
602013
Stable earliest starting schedules for cyclic job shops: a linear system approach
TE Lee
International Journal of Flexible Manufacturing Systems 12, 59-80, 2000
602000
The system can't perform the operation now. Try again later.
Articles 1–20